(Counter shaping and polishing at McNeal)
(Minutes)
Line 33: Line 33:
  
  
st2 mailed to fernando, get back
 
gainmeasurment needs to be done
 
 
-> find out gain issue
 
sipm's came in
 
roughen faces
 
cross talk, when side to side
 
 
new coda installation, coda 3 getting help from David Abbott
 
vme discriminator for fiu
 
  
 
==Review minutes from previous meeting==
 
==Review minutes from previous meeting==
  
We reviewd the [[GlueX Start Counter Meeting, November 15, 2012#Minutes|minutes from the November 15th meeting]].
+
We reviewed the [[GlueX Start Counter Meeting, November 15, 2012#Minutes|minutes from the November 15th meeting]].
  
 
FIU has found sufficient HV channels to get by for now. Another CAEN module is on order.
 
FIU has found sufficient HV channels to get by for now. Another CAEN module is on order.
Line 57: Line 47:
  
 
==SiPM read-out status==
 
==SiPM read-out status==
 +
 +
* Eric mailed the broken ST-2 board to Fernando Barbosa. The gain measurement still needs to be done before Fernando finalizes all of the component values.
 +
* Eugene reported that a shipment of SiPMs from Hamamatsu came in this week. Some of those can be used for more start counter read-out cards.
 +
* FIU is installing a new version of CODA, version 3. They are getting help from David Abbott and things are going well.
 +
* FIU could use a few more discrimintator channels. JLab will look into getting one of the new VME discriminators for them.
 +
 
==Light collection study status==
 
==Light collection study status==
 +
 +
roughen faces
 +
cross talk, when side to side
 +
 
==Contract==
 
==Contract==
 +
 +
examples sent

Revision as of 19:24, 3 December 2012

GlueX Start Counter Meeting
Thursday, November 29, 2012
10 am EST
JLab: CEBAF Center F326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Counter shaping and polishing at McNeal
  4. SiPM read-out status
  5. Light collection study status
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khertarpal, Eric Pooser
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Beni Zihlmann


Review minutes from previous meeting

We reviewed the minutes from the November 15th meeting.

FIU has found sufficient HV channels to get by for now. Another CAEN module is on order.

Counter shaping and polishing at McNeal

Eric went through an abridged version of the presentation he gave for the CEO of McNeal on recent experience with the scintillator. See his slides for details. He showed evidence for degradation of the attenuation length that is likely due to mishandling at McNeal.

Werner also points out that we should research how the heating and bending may affect scintillator long-term quality even if mechanical handling is done properly. He will talk to Eljen about this.

SiPM read-out status

  • Eric mailed the broken ST-2 board to Fernando Barbosa. The gain measurement still needs to be done before Fernando finalizes all of the component values.
  • Eugene reported that a shipment of SiPMs from Hamamatsu came in this week. Some of those can be used for more start counter read-out cards.
  • FIU is installing a new version of CODA, version 3. They are getting help from David Abbott and things are going well.
  • FIU could use a few more discrimintator channels. JLab will look into getting one of the new VME discriminators for them.

Light collection study status

roughen faces cross talk, when side to side

Contract

examples sent