Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | New Note 23 | ||
+ | |||
+ | start counter meeting minutes | ||
+ | |||
+ | • notes as minutes | ||
+ | • present | ||
+ | • sections | ||
+ | |||
+ | To Do | ||
+ | |||
+ | - only one alarm clock, not three, check it in | ||
+ | |||
+ | Notes | ||
+ | |||
+ | did a single photon measuemrnt of phototube, number os photoelectrons | ||
+ | |||
+ | sraifht elgen board , put that at different position | ||
+ | can measure the gain of the sipm | ||
+ | |||
+ | hv problemsd, fixed yesterday | ||
+ | |||
+ | looking at mcneal bar | ||
+ | |||
+ | one broken | ||
+ | edges look good | ||
+ | a month has passed, noticing internal crazing as seen in previous bars | ||
+ | took up to lab, looked at it with laser, see defects, | ||
+ | see same haze o fine tracks, internal crazing | ||
+ | 2mm ej212 bar originally sent | ||
+ | same sort of deterization | ||
+ | 3 mm bar srai=ght, also 204 bar, they look fine, kept at FIU, handled only by werner and Eric | ||
+ | |||
+ | internal crazing | ||
+ | |||
+ | mainframe hv died, can only turn on 2 or three channels | ||
+ | 1454 | ||
+ | want to borrow something | ||
+ | CAEN unit belongs to pyrex | ||
+ | need 6 channels | ||
+ | model number for caen mainframe | ||
+ | look at hall b mainframe | ||
+ | caen sy2527 | ||
+ | |||
+ | dollar amount of contract, does that sijmplify | ||
+ | |||
+ | frame proposal writing process for werner | ||
+ | measure scintillators | ||
+ | get them started on next batch | ||
+ | no money, get started on next batch | ||
+ | is there a way we can fund them |
Revision as of 12:53, 15 November 2012
GlueX Start Counter Meeting
Thursday, November 15, 2012
10 am EDT
JLab: CEBAF Center F326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Mechanical Design
- Read-out Design
- Simulation: Thickness studies
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct meeting link
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .
Minutes
New Note 23
start counter meeting minutes
• notes as minutes • present • sections
To Do
- only one alarm clock, not three, check it in
Notes
did a single photon measuemrnt of phototube, number os photoelectrons
sraifht elgen board , put that at different position can measure the gain of the sipm
hv problemsd, fixed yesterday
looking at mcneal bar
one broken edges look good a month has passed, noticing internal crazing as seen in previous bars took up to lab, looked at it with laser, see defects, see same haze o fine tracks, internal crazing 2mm ej212 bar originally sent same sort of deterization 3 mm bar srai=ght, also 204 bar, they look fine, kept at FIU, handled only by werner and Eric
internal crazing
mainframe hv died, can only turn on 2 or three channels 1454 want to borrow something CAEN unit belongs to pyrex need 6 channels model number for caen mainframe look at hall b mainframe caen sy2527
dollar amount of contract, does that sijmplify
frame proposal writing process for werner measure scintillators get them started on next batch no money, get started on next batch
is there a way we can fund them