==Agenda==
 
==Agenda==
 +
* Start Counter for KLF: Agenda points requested by KLF group ([https://halldweb.jlab.org/talks/2023/StartCounter/sc_with_KLF_beam.gif GlueX Start Counter Geometry])
 +
** SC upgrade (including plastic and detectors)
 +
** Its connection to Cryo target
 +
** A possibility to use JLab machine shop for SC
 +
** Can Hall D pay for the SC work
 
* Start Counter status:
 
* Start Counter status:
 
** Calibration: [https://halldweb.jlab.org/wiki/index.php/Start_Counter_Calibration_Procedures SC Calibration Wiki Page]<br>[https://halldweb.jlab.org/talks/2023/StartCounter/Start_Counter-5.pdf Start Counter Calibration Notes]
 
** Calibration: [https://halldweb.jlab.org/wiki/index.php/Start_Counter_Calibration_Procedures SC Calibration Wiki Page]<br>[https://halldweb.jlab.org/talks/2023/StartCounter/Start_Counter-5.pdf Start Counter Calibration Notes]
Line 18: Line 23:
 
*** Annealing program started heating at 47 degree Celsius with "heat-tape". Initial exposure time is till Christmas break.
 
*** Annealing program started heating at 47 degree Celsius with "heat-tape". Initial exposure time is till Christmas break.
 
*** Operating voltages can not be increased in order to bump up the gain. The dark rate increases exponentially.
 
*** Operating voltages can not be increased in order to bump up the gain. The dark rate increases exponentially.
* Start Counter for KLF: Agenda points requested by KLF group
 
** SC upgrade (including plastic and detectors)
 
** Its connection to Cryo target
 
** A possibility to use JLab machine shop for SC
 
** Can Hall D pay for the SC work
 
  
 
== Minutes ==
 
== Minutes ==
present:
+
present: Moskov, Igor, Eugene, Hovanes, Beni
  
 +
main discussion points:
 +
* beam line simulation and impact of the beam on the Start Counter in terms of rate and radiation damage.
 +
* what are the requirements for the Start Counter?
 +
* what are the requirements on DAQ and trigger?
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 09:48, 27 November 2023

GlueX Start Counter Meeting
Monday, November 13, 2023
9:00 am EDT

Meeting information: https://jlab-org.zoomgov.com/j/1604147172?pwd=QjRtMDRRQ0lVNW5oVVA0VmFMSnh1dz09
Benedikt Zihlmann is inviting you to a scheduled ZoomGov meeting.
Topic: Start Counter

Agenda

  • Start Counter for KLF: Agenda points requested by KLF group (GlueX Start Counter Geometry)
    • SC upgrade (including plastic and detectors)
    • Its connection to Cryo target
    • A possibility to use JLab machine shop for SC
    • Can Hall D pay for the SC work
  • Start Counter status:

Minutes

present: Moskov, Igor, Eugene, Hovanes, Beni

main discussion points:

  • beam line simulation and impact of the beam on the Start Counter in terms of rate and radiation damage.
  • what are the requirements for the Start Counter?
  • what are the requirements on DAQ and trigger?

Action Items

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2023 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2023/ .