Difference between revisions of "GlueX Start Counter Meeting, May 17, 2012"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(3 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
# Review [[GlueX Start Counter Meeting, May 3, 2012#Minutes|minutes from previous meeting]]
 
# Review [[GlueX Start Counter Meeting, May 3, 2012#Minutes|minutes from previous meeting]]
 
# Prototype Report
 
# Prototype Report
# [https://halldweb1.jlab.org/talks/2012-2Q/sc_5_17_12.pptx Readout Design]
+
# [https://halldweb.jlab.org/talks/2012-2Q/sc_5_17_12.pptx Readout Design]
#* [https://halldweb1.jlab.org/talks/2012-2Q/ST%20Readout.pdf Fernando's note]
+
#* [https://halldweb.jlab.org/talks/2012-2Q/ST%20Readout.pdf Fernando's note]
 
# Simulation
 
# Simulation
#* presentation from previous collaboration meeting [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1921]
+
#* presentation from previous collaboration meeting [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1921]
  
 
=Communication Information=
 
=Communication Information=
Line 25: Line 25:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2012-2Q/ .
  
 
=Minutes=
 
=Minutes=
Line 33: Line 33:
 
* '''JLab''': Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Yi Qiang, Tim Whitlatch, Beni Zihlmann
 
* '''JLab''': Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Yi Qiang, Tim Whitlatch, Beni Zihlmann
  
simluation
+
==Simluation==
  
background rates w/ updated geometry
+
Puneet is going to start background rates studies with the new updated (30 paddle) geometry.
  
chuck shows design
+
==Mechanical Design==
  
termal mat in back pocket if needed
+
Chuck showed the latest progress on the design. See [https://halldweb.jlab.org/talks/2012-2Q/sc_5_17_12.pptx his slides] for various views of the start counter focusing on the read-out area. Realistic drawings of the SiPM read-out boards are now included. Some highlights of the discussion:
  
spacer in between boards for light tight
+
* A thermal mat could be used if needed to help cool the boards. Currently it is not in the plan.
 +
* There is spacer shown between the read-out boards for light tightening the counter volume.
 +
* Bolt holes holding the SiPM boards (ST1) to the support tube will serve as positioners.
 +
* A positioning template will be used when scintillators are attached to the foam to guarantee good alighnment with the SiPM's.
 +
* There will be air gap between the scintillator and the SiPMs.
 +
* There is currently a problem with interference of cable connector with support tube. A compromise with the target design will have to be struck.
  
bolt holes serve as positioners
+
==SiPM Read-Out Boards==
scintillators need to be set precisely
+
use postioning template when scint attached to foam
+
  
tolerance less than 1 mm
+
Fernando reported that the plan is to send out the design tomorrow. It should be in fabrication by next week.
there will be air gap
+
  
problem with interference of cable connector
+
==Prototype News==
  
rigid flex cable possible
+
Two scintillator samples came in from McNeal. One was badly crazed, but the other does not look so bad. Timing tests are next (for the good one).
  
nick sandoval is the tecnician working on thes
+
==TDR==
  
plan to send out tomorrow
+
Werner continues to working on the TDR
in fab by next week
+
 
+
got schint from McNeal
+
one destroyed
+
other not bad
+
werner working on tdr
+
 
+
• put yi on start counter meeting attendees
+

Latest revision as of 17:00, 24 February 2017

GlueX Start Counter Meeting
Thursday, May 17, 2012
10 am EDT
JLab: ARC 428

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. Readout Design
  5. Simulation
    • presentation from previous collaboration meeting [1]

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2012-2Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal
  • JLab: Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Yi Qiang, Tim Whitlatch, Beni Zihlmann

Simluation

Puneet is going to start background rates studies with the new updated (30 paddle) geometry.

Mechanical Design

Chuck showed the latest progress on the design. See his slides for various views of the start counter focusing on the read-out area. Realistic drawings of the SiPM read-out boards are now included. Some highlights of the discussion:

  • A thermal mat could be used if needed to help cool the boards. Currently it is not in the plan.
  • There is spacer shown between the read-out boards for light tightening the counter volume.
  • Bolt holes holding the SiPM boards (ST1) to the support tube will serve as positioners.
  • A positioning template will be used when scintillators are attached to the foam to guarantee good alighnment with the SiPM's.
  • There will be air gap between the scintillator and the SiPMs.
  • There is currently a problem with interference of cable connector with support tube. A compromise with the target design will have to be struck.

SiPM Read-Out Boards

Fernando reported that the plan is to send out the design tomorrow. It should be in fabrication by next week.

Prototype News

Two scintillator samples came in from McNeal. One was badly crazed, but the other does not look so bad. Timing tests are next (for the good one).

TDR

Werner continues to working on the TDR