=Minutes=
 +
 +
start counter meeting minutes
 +
 +
puneet, werner
 +
beni, fernando, tim, mark, chuck, yi
 +
 +
simluation
 +
 +
background rates w/ updated geometry
 +
 +
chuck shows design
 +
 +
termal mat in back pocket if needed
 +
 +
spacer in between boards for light tight
 +
 +
bolt holes serve as positioners
 +
scintillators need to be set precisely
 +
use postioning template when scint attached to foam
 +
 +
tolerance less than 1 mm
 +
there will be air gap
 +
 +
problem with interference of cable connector
 +
 +
rigid flex cable possible
 +
 +
nick sandoval is the tecnician working on thes
 +
 +
plan to send out tomorrow
 +
in fab by next week
 +
 +
got schint from McNeal
 +
one destroyed
 +
other not bad
 +
werner working on tdr
 +
 +
• put yi on start counter meeting attendees

Revision as of 10:00, 31 May 2012

GlueX Start Counter Meeting
Thursday, May 17, 2012
10 am EDT
JLab: ARC 428

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. Readout Design
  5. Simulation
    • presentation from previous collaboration meeting [1]

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Minutes

start counter meeting minutes

puneet, werner beni, fernando, tim, mark, chuck, yi

simluation

background rates w/ updated geometry

chuck shows design

termal mat in back pocket if needed

spacer in between boards for light tight

bolt holes serve as positioners scintillators need to be set precisely use postioning template when scint attached to foam

tolerance less than 1 mm there will be air gap

problem with interference of cable connector

rigid flex cable possible

nick sandoval is the tecnician working on thes

plan to send out tomorrow in fab by next week

got schint from McNeal one destroyed other not bad werner working on tdr

• put yi on start counter meeting attendees