Difference between revisions of "GlueX Start Counter Meeting, June 30, 2011"
From GlueXWiki
(copy of last time) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Location, Time= | =Location, Time= | ||
− | Thursday, June | + | Thursday, June 30, 2011<br> |
3:30 pm EDT<br> | 3:30 pm EDT<br> | ||
JLab: CEBAF Center, Room F326/7<br> | JLab: CEBAF Center, Room F326/7<br> | ||
− | + | =Agenda= | |
− | + | # Announcements | |
+ | # Review [[GlueX Start Counter Meeting, June 16, 2011#Minutes|minutes from previous meeting]]: all | ||
+ | # Start Counter News | ||
+ | # MOU status | ||
− | = | + | =Communication Information= |
− | + | ==Telephone== | |
− | + | To connect by telephone: | |
+ | # dial: | ||
+ | #* US and Canada: (866)740-1260 (toll free) | ||
+ | #* International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl | ||
+ | # enter access code followed by the # sign: 3421244# | ||
− | + | ==Video Conferencing== | |
− | = | + | * ESNet: 8542553 |
+ | * [http://evo.caltech.edu/ EVO]: | ||
+ | ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=292I2iMeMB9M9nDD9aD9 <!--good through November 3--> | ||
+ | ** Phone Bridge ID: 10 1295 | ||
− | + | ==Slides== | |
+ | |||
+ | Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this. | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Present: | ||
+ | * '''FIU''': Lei Guo, Eric Pooser | ||
+ | * '''JLab''': Puneet Khetarpal, Mark Ito (chair), Beni Zihlmann | ||
+ | |||
+ | ==Prototype== | ||
+ | |||
+ | * Eric is finishing building the dark box that will house the scintillator and long light guide for tests. Once it is built they can test with and without a light guide. | ||
+ | * Lei has sent a design of a holder for a fiber light guide to be used with the FM-PMT to Plastic Craft for a quote. | ||
+ | * No work on SiPM testing since the last meeting. No new pre-amp/SiPM combinations have been sent to FIU for testing. | ||
+ | * Eric has been doing some tests to commission a new trigger counter for the final set-up. | ||
==MOU== | ==MOU== | ||
− | + | * The MOU has gone through the concurrence chain at JLab and has been sent to Werner to get signatures at FIU. | |
+ | |||
+ | ==New Action Items== | ||
+ | |||
+ | # Arrange SiPM discussion again with Fernando and FIU. -> Mark |
Latest revision as of 06:58, 1 April 2015
Contents
Location, Time
Thursday, June 30, 2011
3:30 pm EDT
JLab: CEBAF Center, Room F326/7
Agenda
- Announcements
- Review minutes from previous meeting: all
- Start Counter News
- MOU status
Communication Information
Telephone
To connect by telephone:
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Video Conferencing
- ESNet: 8542553
- EVO:
- Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=292I2iMeMB9M9nDD9aD9
- Phone Bridge ID: 10 1295
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this.
Minutes
Present:
- FIU: Lei Guo, Eric Pooser
- JLab: Puneet Khetarpal, Mark Ito (chair), Beni Zihlmann
Prototype
- Eric is finishing building the dark box that will house the scintillator and long light guide for tests. Once it is built they can test with and without a light guide.
- Lei has sent a design of a holder for a fiber light guide to be used with the FM-PMT to Plastic Craft for a quote.
- No work on SiPM testing since the last meeting. No new pre-amp/SiPM combinations have been sent to FIU for testing.
- Eric has been doing some tests to commission a new trigger counter for the final set-up.
MOU
- The MOU has gone through the concurrence chain at JLab and has been sent to Werner to get signatures at FIU.
New Action Items
- Arrange SiPM discussion again with Fernando and FIU. -> Mark