(notes as minutes) |
|||
Line 25: | Line 25: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ . | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Start Counter Meeting | ||
+ | |||
+ | 6/28/12 | ||
+ | |||
+ | chuck, beni, mark, eugene, | ||
+ | |||
+ | |||
+ | werner | ||
+ | |||
+ | sr90 source | ||
+ | order 2 or three more detectors | ||
+ | |||
+ | wrapping the detectors, | ||
+ | prevent contact with reflective material | ||
+ | |||
+ | mini coax still needed for start counter | ||
+ | |||
+ | mechanical on hold | ||
+ | concept there | ||
+ | look at schedule, make in october | ||
+ | |||
+ | device for assembly | ||
+ | if central support , need something to hold things in place | ||
+ | pneumatic pistons | ||
+ | 3rd of august start assembly | ||
+ | scintillators cost, platic craft 3k for 5 | ||
+ | mcneal $700 per, 200 $ per | ||
+ | |||
+ | start on the con | ||
+ | today, send example to werner, mark | ||
+ | |||
+ | puneet background studies, issues to resolve | ||
+ | 10^7 running, 5 and 50 kHz for em background | ||
+ | |||
+ | puneet will report in two weeks |
Revision as of 14:00, 28 June 2012
GlueX Start Counter Meeting
Thursday, June 28, 2012
10 am EDT
JLab: CEBAF Center F326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Mechanical Design
- Read-out Design
- Simulation: Start Counter Background Studies
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct meeting link
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
Minutes
Start Counter Meeting
6/28/12
chuck, beni, mark, eugene,
werner
sr90 source order 2 or three more detectors
wrapping the detectors, prevent contact with reflective material
mini coax still needed for start counter
mechanical on hold concept there look at schedule, make in october
device for assembly if central support , need something to hold things in place pneumatic pistons 3rd of august start assembly scintillators cost, platic craft 3k for 5 mcneal $700 per, 200 $ per
start on the con today, send example to werner, mark
puneet background studies, issues to resolve 10^7 running, 5 and 50 kHz for em background
puneet will report in two weeks