GlueX Start Counter Meeting, July 12, 2012

From GlueXWiki
Revision as of 16:22, 12 July 2012 by Marki (Talk | contribs)

Jump to: navigation, search

GlueX Start Counter Meeting
Thursday, July 12, 2012
10 am EDT
JLab: CEBAF Center F326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Mechanical Design
  4. Read-out Design
    • read-out board
    • read-out board with cables
  5. Simulation: Start Counter Background Studies
  6. Contract

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Start Counter Meeting Notes

mark, tim puneet, chuck, eugene, beni lei


76 mm 3mm 600 mm wide piece of scintillatoer, 5 pieces ordered form elgen

mechanical holding finalize foam, buy made

preliminary drawings will be produced by chuck so mcneal can make the correct shape

still checks on simulation, will meet with Sasha

different optical properties for different edges of scintillator, edge surface quality not as good strategy from g4 workshop

contract app, must go faster


Describe your new note here.