Difference between revisions of "GlueX Phase III 18-Sep-23"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Coordinates == The meeting will be on Monday, September 18, 2023 at 3:00 PM ET. For those in-person at JLab F326 is reserved ==== Connecting ==== To connect to...")
 
Line 23: Line 23:
 
== Links ==
 
== Links ==
  
 +
* [[GlueX_Phase_III_Planning | GlueX Phase III Planning Overview]]
 
* [https://www.jlab.org/physics/experiments/schedule CEBAF Accelerator Schedule]
 
* [https://www.jlab.org/physics/experiments/schedule CEBAF Accelerator Schedule]
  

Revision as of 11:17, 19 September 2023

Meeting Coordinates

The meeting will be on Monday, September 18, 2023 at 3:00 PM ET. For those in-person at JLab F326 is reserved

Connecting

To connect to the meeting, please go to the listing of Zoom meetings on the private Wiki and select the GlueX/Hall D Biweekly Meeting link at the top of the list.

Agenda

  • reorder agenda items below based on any schedule constraints -- any additions?
  • operating the tagger at 2x rates (Richard?, Beni)
  • TOF at 2x rates and TOF upgrades (Beni, Paul, Sean)
  • START at 2x rates (Igal, Beni)
  • trigger at 2x nominal intensity (Sasha)
  • simulation brainstorming/discussion (Simon, Igal)
  • scintillating fiber R&D thoughts (Sasha, Zisis)
  • scintillating tile R&D thoughts (Justin)
  • approximate schedule/plan for TRD R&D (Lubomir)
  • discussion of scenarios: what might a PAC proposal for 2025 look like? (All)
  • brief summary to present at collaboration meeting (Justin)

Links

Minutes

Present: Igal, Simon, Eugene, Lubomir, Beni, Naomi, Justin, Zisis, Sean, Matt, Alex A. (online), Sasha (online)