Difference between revisions of "GlueX PID Meeting, May 28, 2010"

From GlueXWiki
Jump to: navigation, search
m (Agenda)
Line 18: Line 18:
 
## Status of PMT purchase (for prototype testing)
 
## Status of PMT purchase (for prototype testing)
 
## Electronics: signal split scheme (no dynode signal)
 
## Electronics: signal split scheme (no dynode signal)
 +
## Prototype progress
 +
## Status of the MOU
 
# Start Counter
 
# Start Counter
## prototype status: attenuation length measurements
+
## prototype progress: attenuation length measurements
 
# Target
 
# Target
 
## Status of the MOU
 
## Status of the MOU
 
## Status of refrigerator plan
 
## Status of refrigerator plan
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]

Revision as of 11:50, 26 May 2010

Location, Time

Friday, May 28, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-05 on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-05/ .

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Time-of-Flight
    1. Calibration: variation of pulser amplitude for time walk correction measurement
    2. Change in thickness of TOF counters?
    3. Status of PMT purchase (for prototype testing)
    4. Electronics: signal split scheme (no dynode signal)
    5. Prototype progress
    6. Status of the MOU
  4. Start Counter
    1. prototype progress: attenuation length measurements
  5. Target
    1. Status of the MOU
    2. Status of refrigerator plan
  6. Action Items