Difference between revisions of "GlueX PID Meeting, May 28, 2010"

From GlueXWiki
Jump to: navigation, search
(agenda)
m (Agenda)
Line 17: Line 17:
 
## Change in thickness of TOF counters?
 
## Change in thickness of TOF counters?
 
## Status of PMT purchase (for prototype testing)
 
## Status of PMT purchase (for prototype testing)
## Electronics: signal split scheme
+
## Electronics: signal split scheme (no dynode signal)
 
# Start Counter
 
# Start Counter
 
## prototype status: attenuation length measurements
 
## prototype status: attenuation length measurements

Revision as of 10:51, 26 May 2010

Location, Time

Friday, May 28, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-05 on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-05/ .

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Time-of-Flight
    1. Calibration: variation of pulser amplitude for time walk correction measurement
    2. Change in thickness of TOF counters?
    3. Status of PMT purchase (for prototype testing)
    4. Electronics: signal split scheme (no dynode signal)
  4. Start Counter
    1. prototype status: attenuation length measurements
  5. Target
    1. Status of the MOU
    2. Status of refrigerator plan
  6. Action Items