(agenda) |
|||
Line 13: | Line 13: | ||
# Announcements | # Announcements | ||
# [[GlueX PID Meeting, April 30, 2010#Minutes|Minutes from the last meeting]] | # [[GlueX PID Meeting, April 30, 2010#Minutes|Minutes from the last meeting]] | ||
− | # Status | + | # Time-of-Flight |
+ | ## Calibration: variation of pulser amplitude for time walk correction measurement | ||
+ | ## Change in thickness of TOF counters? | ||
+ | ## Status of PMT purchase (for prototype testing) | ||
+ | ## Electronics: signal split scheme | ||
+ | # Start Counter | ||
+ | ## prototype status: attenuation length measurements | ||
+ | # Target | ||
+ | ## Status of the MOU | ||
+ | ## Status of refrigerator plan | ||
# [[Time-of-Flight/Start-Counter Action Items|Action Items]] | # [[Time-of-Flight/Start-Counter Action Items|Action Items]] |
Revision as of 10:50, 26 May 2010
Location, Time
Friday, May 28, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-05
on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-05/ .
Agenda
- Announcements
- Minutes from the last meeting
- Time-of-Flight
- Calibration: variation of pulser amplitude for time walk correction measurement
- Change in thickness of TOF counters?
- Status of PMT purchase (for prototype testing)
- Electronics: signal split scheme
- Start Counter
- prototype status: attenuation length measurements
- Target
- Status of the MOU
- Status of refrigerator plan
- Action Items