Difference between revisions of "GlueX PID Meeting, August 6, 2010"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(notes for minutes)
Line 5: Line 5:
 
JLab: CEBAF Center, Room F326/7<br>
 
JLab: CEBAF Center, Room F326/7<br>
 
ESNet: 8542553<br>
 
ESNet: 8542553<br>
[http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<ref>This link is good through 8/20</ref><br>
+
[http://evo.caltech.edu EVO]: [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<!-- This link is good through 8/20 --><br>
 
Conference Group: 800-377-8846, participant code: 77438230<br>
 
Conference Group: 800-377-8846, participant code: 77438230<br>
 
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-08</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-08/ .
 
'''Slides''': talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2010-08</code> on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-08/ .
Line 22: Line 22:
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]
 
# [[Time-of-Flight/Start-Counter Action Items|Action Items]]
  
----
+
=Minutes=
  
'''Footnotes'''
+
* '''FSU''': Paul Eugenio
<references/>
+
* '''JLab''': Mark Ito (chair), Chris Keith, Sascha Somov, Simon Taylor, Beni Zihlmann
 +
 
 +
paul contacted hamamatsu, factory confirms delivery schedule
 +
one base of each type, select and select mod, by 22 Aug
 +
remainder on sep 27
 +
 
 +
chair has signed the mou and moved it to the dean
 +
 
 +
wed. bad for Paul
 +
 
 +
he was going to get a splitter from fernando
 +
 
 +
prototype Paul?
 +
 
 +
JLab china gluex talk
 +
 
 +
sasha away
 +
 
 +
working on the new trigger processor, readout tagged adc and tdc events together.
 +
 
 +
material from 3M, current name DF2000MA, was told that we
 +
rough cut sheets a possibility
 +
 
 +
MOU issues:
 +
• lab space, getting another new lab in nuclear research building for assembly, enough room to set up stations

Revision as of 11:32, 9 August 2010

Location, Time

Friday, August 6, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-08 on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-08/ .

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Time-of-Flight
    1. Prototype progress
    2. Status of the MOU
  4. Start Counter
    1. prototype status
  5. Target
    1. Status of the MOU
  6. Action Items

Minutes

  • FSU: Paul Eugenio
  • JLab: Mark Ito (chair), Chris Keith, Sascha Somov, Simon Taylor, Beni Zihlmann

paul contacted hamamatsu, factory confirms delivery schedule one base of each type, select and select mod, by 22 Aug remainder on sep 27

chair has signed the mou and moved it to the dean

wed. bad for Paul

he was going to get a splitter from fernando

prototype Paul?

JLab china gluex talk

sasha away

working on the new trigger processor, readout tagged adc and tdc events together.

material from 3M, current name DF2000MA, was told that we rough cut sheets a possibility

MOU issues: • lab space, getting another new lab in nuclear research building for assembly, enough room to set up stations