Difference between revisions of "GlueX-II and DIRC ERR"
From GlueXWiki
(→Monday June 25, 2018) |
|||
Line 10: | Line 10: | ||
** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]] | ** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]] | ||
* Pre-brief material: | * Pre-brief material: | ||
+ | ** [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Documentation for Shift Takers] | ||
** Safety documentation | ** Safety documentation | ||
** Computing requirements | ** Computing requirements |
Revision as of 17:38, 18 May 2018
Experimental Readiness Review for Gluex-II high intensity and the DIRC
Monday June 25, 2018
- Charge
- Agenda (TBD)
- Proposals and reviews:
- Pre-brief material:
- Documentation for Shift Takers
- Safety documentation
- Computing requirements
Presentations:
- DIRC project: overview and status (30+15) --- Justin Stevens
- DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
- GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence