Difference between revisions of "GlueX-II and DIRC ERR"

From GlueXWiki
Jump to: navigation, search
Line 13: Line 13:
 
** Computing requirements
 
** Computing requirements
  
* Presentations:
+
 
 +
'''Presentations:'''
 
** DIRC project: overview and status (30+15) --- Justin Stevens
 
** DIRC project: overview and status (30+15) --- Justin Stevens
 
** DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
 
** DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
 
** GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence
 
** GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence

Revision as of 10:47, 18 May 2018

Experimental Readiness Review for Gluex-II high intensity and the DIRC

Monday June 25, 2018


Presentations:

    • DIRC project: overview and status (30+15) --- Justin Stevens
    • DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
    • GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence