Difference between revisions of "GlueX-II and DIRC ERR"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
Experimental Readiness Review for Gluex-II high intensity and the DIRC
 
Experimental Readiness Review for Gluex-II high intensity and the DIRC
  
2018 June 25
+
== Monday June 25, 2018 ==
 
+
 
* [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]]
 
* [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]]
 +
* Agenda (TBD)
 +
* Proposals and reviews:
 +
** [https://www.jlab.org/exp_prog/proposals/13/PR12-13-003.pdf Approved proposal at PAC40 (High Intensity)]
 +
** [https://www.jlab.org/exp_prog/proposals/14/C12-12-002.pdf Approved proposal at PAC42 (High Intensity + DIRC)]
 +
** [[2015_October_14_DIRC_Project_Review | DIRC Capital Equipment Project Review (October 2015) ]]
 +
** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]]
 +
* Pre-brief material:
 +
** Safety documentation
 +
** Computing requirements
 +
 +
* Presentations:
 +
** DIRC project: overview and status (30+15) --- Justin Stevens
 +
** DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
 +
** GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence

Revision as of 10:47, 18 May 2018

Experimental Readiness Review for Gluex-II high intensity and the DIRC

Monday June 25, 2018

  • Presentations:
    • DIRC project: overview and status (30+15) --- Justin Stevens
    • DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
    • GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence