Difference between revisions of "GlueX-Collaboration-Jan-2008"

From GlueXWiki
Jump to: navigation, search
(Thursday January 10, 2008)
Line 1: Line 1:
 
== Thursday January 10, 2008 ==
 
== Thursday January 10, 2008 ==
  
* Session Ia (Opening)
+
* Session Ia --- Opening  
** 9:00am  Welcome
+
** 9:00am  Welcome                       Curtis Meyer
** 9:15am  Update on Project Status
+
** 9:15am  Update on Project Status       Elke Aschenauer
** 10:00am Upcoming Reviews
+
** 10:00am Upcoming Reviews               Elton Smith
** Magnet Updates
+
  
 
* Coffee Break
 
* Coffee Break
 
** 10:30am
 
** 10:30am
  
* Session Ib Status on Decisions
+
* Session Ib Infrastructure
** 10:45am Calorimeter Transition Region
+
** 10:15am Magnet Updates                George
** 11:15am FDC Design Choice
+
** The Hall
** Report on Electronics
+
 
 
* Lunch
 
* Lunch
 
* Session IIa (Calorimeter)  
 
* Session IIa (Calorimeter)  
Line 20: Line 19:
 
** FCAL
 
** FCAL
 
** Calorimetry Review
 
** Calorimetry Review
 
+
** 10:45am Calorimeter Transition Region
 +
** 11:15am FDC Design Choice
 +
** Report on Electronics
 
* Session IIb  Beamline/Tagger
 
* Session IIb  Beamline/Tagger
 +
 
== Friday January 11, 2008 ==
 
== Friday January 11, 2008 ==
 
* Session IIIa Software  
 
* Session IIIa Software  

Revision as of 10:05, 18 December 2007

Thursday January 10, 2008

  • Session Ia --- Opening
    • 9:00am Welcome Curtis Meyer
    • 9:15am Update on Project Status Elke Aschenauer
    • 10:00am Upcoming Reviews Elton Smith
  • Coffee Break
    • 10:30am
  • Session Ib Infrastructure
    • 10:15am Magnet Updates George
    • The Hall
  • Lunch
  • Session IIa (Calorimeter)
    • BCAL
    • SciPM
    • FCAL
    • Calorimetry Review
    • 10:45am Calorimeter Transition Region
    • 11:15am FDC Design Choice
    • Report on Electronics
  • Session IIb Beamline/Tagger

Friday January 11, 2008

  • Session IIIa Software
    • Monte Carlo
    • Offline Sofware
    • Online and DAQ
  • Session IIIb Tracking
    • CDC
    • FDC
    • Tracking Review
  • Lunch
  • Session IVa (Tracker Status)
  • Collaboration Board Meeting

Saturday January 12, 2008

  • Session Va
    • Report from the Collaboration Board
    • Design Report Update
    • Physics Workshop Update
    • Closeout