Revision as of 12:04, 17 February 2011

To-do list

  • Wiring
    • remove jumper box and cables and bring to F117 for rework - done
    • remove current-limiting resistor boxes, bring to F117 for rework - done
    • minimize summed coil voltage readouts, do most sums in PLC - done
    • add separate readouts of splice and vapor-cooled lead voltages - done
    • combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller - done
    • match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors - done
    • read out voltage taps for quench detection and DAQ using separate resistor chain - done
    • update wiring diagrams to "as built" - done
    • get diagrams and spec sheets to Fernando - done
    • understand noise, signal clipping and interaction between readout modules


  • Danfysik power supply
    • understand ramp-down mechanism - done
    • measure fast dump resistors in power supply - done
    • eliminate 2V DC offset - done
    • fix slow dump - done
    • implement ground fault detection compatible with quench detector
    • make more copies of full Danfysik power supply manual (get from Steve L) - done
  • Danfysik quench detector
    • match and balance resistors - done
    • install test points for gain/offset tuning - done
    • install pots for balance - done
    • install bias circuit to account for Danfysik DC offset and common mode voltage - done
  • Dataforth system
    • Correct for 2M Ohm internal impedance and 200k Ohm resistors in voltage tap readouts - done
  • USB device
    • install voltage dividers to extend voltage range - done
    • add resistors to Zener protection circuit - done
  • automated elog entries
    • automatically dump screens to files - done
    • create perl script
    • create cron job
  • A-B HMI improvements
    • get additional HMI client license from Steve - done
    • get second HMI computer working - done
    • implement A-B license server - done
    • get A-B IIS file server system working - done
    • upgrade to 100 screen license if needed
    • change HMI database to MySql - done
    • create more pre-defined trend plots - done
    • improve screen layouts - done
  • A-B PLC program improvements
    • new channels - done
    • improve, simplify program - done
    • use custom ("add-on") instructions to simplify code
    • try A-B alarm and logging systems - done
    • test PLC-based alarm system
  • EPICS
    • serve out all PLC channels to CA
      • need list from Josh
    • implement guard shack notification for IOC hang/crash
  • EWEB screens
    • update for latest tags and drawings


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?


Basic questions

  • lag between field and current...are there turn-to-turn shorts in coil 1?
    • maybe short, maybe eddy currents...
  • will we open up coil 3 and/or coil 4?
  • do we want an independent review of our fast (and slow) dump strategy and system?
  • document our experience!