Line 9: Line 9:
 
** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
 
** match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
 
** read out voltage taps for quench detection and DAQ using separate resistor chain
 
** read out voltage taps for quench detection and DAQ using separate resistor chain
*** will not go to active isolation for the upcoming coil
 
*** may need active isolation if passive isolation does not work
 
*** may implement active isolation in the hall
 
 
** update wiring diagrams to "as built"
 
** update wiring diagrams to "as built"
 
** get diagrams and spec sheets to Fernando
 
** get diagrams and spec sheets to Fernando
Line 19: Line 16:
 
* Danfysik power supply
 
* Danfysik power supply
 
** understand ramp-down mechanism
 
** understand ramp-down mechanism
** UPS on Danfysik boards and contactor
 
 
** measure fast dump resistors in power supply - done
 
** measure fast dump resistors in power supply - done
 
** eliminate 2V DC offset
 
** eliminate 2V DC offset
Line 30: Line 26:
 
** install test points for gain/offset tuning
 
** install test points for gain/offset tuning
 
** install pots for external balance if unable to eliminate DC offset
 
** install pots for external balance if unable to eliminate DC offset
** note that max ramp rate in the hall is 10V / 20H = 0.5 A/sec
 
  
 
* USB device
 
* USB device
Line 58: Line 53:
 
** minimize ice buildup
 
** minimize ice buildup
 
** more heating/insulation on N2 vent line
 
** more heating/insulation on N2 vent line
** do we need cold traps?
 
** do we need additional valves, check valves, bypasses, whatever?
 
 
** can we calibrate the C-glass sensors somehow?
 
** can we calibrate the C-glass sensors somehow?
 +
 +
 +
 +
'''For the hall'''
 +
* UPS on Danfysik boards and contactor
 +
* may implement active isolation depending on test results
 +
* max ramp rate in the hall is 10V / 20H = 0.5 A/sec
 +
* do we need additional valves, check valves, bypasses, whatever?
 +
  
  

Revision as of 12:00, 19 January 2011

To-do list

  • Wiring
    • remove jumper box and cables and bring to F117 for rework - done
    • remove current-limiting resistor boxes, bring to F117 for rework - done
    • minimize summed coil voltage readouts, do most sums in PLC
    • add separate readouts of splice and vapor-cooled lead voltages
    • combine splice and lead into one hardware quench/overvoltage protection channel using Newport controller
    • match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
    • read out voltage taps for quench detection and DAQ using separate resistor chain
    • update wiring diagrams to "as built"
    • get diagrams and spec sheets to Fernando
    • understand signal clipping and interaction between readout modules, test and replace if necessary
    • minimize noise
  • Danfysik power supply
    • understand ramp-down mechanism
    • measure fast dump resistors in power supply - done
    • eliminate 2V DC offset
    • fix slow dump - done
    • make more copies of full Danfysik power supply manual (get from Steve L)
  • Danfysik quench detector
    • match and balance resistors
    • revert channels used for splice/leads to normal coil balance mode
    • install test points for gain/offset tuning
    • install pots for external balance if unable to eliminate DC offset
  • USB device
    • install voltage dividers to extend voltage range
    • rework Zener protection circuit
  • automated elog entries
  • A-B HMI improvements
    • additional HMI license, get second computer working
    • dual-redundant HMI server or another machine for the server
    • HMI development machine and license
    • contact A-B salesman about licenses
    • change HMI database to MySql
      • more pre-defined trend plots
    • more HMI screens (may need license upgrade)
    • simplify existing screens
    • better indication of what caused fast/slow dump
  • A-B PLC program improvements
    • simplify many operations
    • improve PLC early problem detection
    • improve PLC cryo control under varying CTF operating conditions
    • implement early-warning quench/overvoltage detection in PLC
  • improve cryo system
    • minimize ice buildup
    • more heating/insulation on N2 vent line
    • can we calibrate the C-glass sensors somehow?


For the hall

  • UPS on Danfysik boards and contactor
  • may implement active isolation depending on test results
  • max ramp rate in the hall is 10V / 20H = 0.5 A/sec
  • do we need additional valves, check valves, bypasses, whatever?


Basic questions

  • what is causing blockage in vapor-cooled lead?
    • broken valve!
  • lag between field and current...are there turn-to-turn shorts in coil 1?
    • maybe short, maybe eddy currents
  • what worked, what didn't for coil 1?
  • what should we do differently for the next coil?
    • will we open up coils 3 and 4?
  • what might we consider doing differently in the hall?
    • do we want an independent review of our fast (and slow) dump strategy and system?
  • have we documented our experience?
  • sub-coil inductances
    • measure with inductance meter on the platform
    • inductance seen on splices
  • did we ever implement guard shack notification?