Difference between revisions of "February 5, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 21: | Line 21: | ||
#* Summary of installation and survey results (Tim, All) | #* Summary of installation and survey results (Tim, All) | ||
# [[Spring 2019 DIRC Commissioning]] (All) | # [[Spring 2019 DIRC Commissioning]] (All) | ||
− | #* Laser test stand calibration analysis (All) | + | #* Laser test stand calibration analysis and threshold scan analysis (All) |
+ | #** Efficiency map in detector coordinates | ||
+ | #** Gain map in detector coordinates | ||
+ | #** DAC threshold scan in detector coordinates | ||
#* LED data analysis (All) | #* LED data analysis (All) | ||
#* Additional LED datasets this week? | #* Additional LED datasets this week? |
Revision as of 11:59, 5 February 2019
Meeting Information
GlueX DIRC Meeting
Monday February 5, 2019
1:00 pm, EDT
JLab Hall D counting house
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation status (All)
- Summary of installation and survey results (Tim, All)
- Spring 2019 DIRC Commissioning (All)
- Laser test stand calibration analysis and threshold scan analysis (All)
- Efficiency map in detector coordinates
- Gain map in detector coordinates
- DAC threshold scan in detector coordinates
- LED data analysis (All)
- Additional LED datasets this week?
- Simulations to generate ASAP?
- Laser test stand calibration analysis and threshold scan analysis (All)
- Software/simulations
- AOB