February 29, 2012 Tracking CDC/FDC

From GlueXWiki
Revision as of 14:28, 29 February 2012 by Nsjarvis (Talk | contribs) (Hardware Minutes)

Jump to: navigation, search

Meeting Time and Place

Wednesday February 29, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. FDC Update logbook
  3. CDC Update
    1. Construction Update
    2. Cosmic Calibration of the Chamber
  4. TDR Update

Tracking Software Agenda

  1. Announcements.
  2. Summary of current work on tracking.
    1. Automated single track reconstruction now working...
      1. Note: hit pruning is on by default, but track recovery (for tracks with kinks or too few hits surviving pruning) is currently (2/29/12) not on by default.
    2. Problems with track finding in CDC

Hardware Minutes

Participants: Curtis, Naomi, Beni, Simon, Lubomir, Elton, Dave

  1. FDC Update
  2. CDC Update
    1. Wire stringing has been completed and the chamber lowered to horizontal.
    2. We are expecting the survey team from JLab next week, the plan is to survey the 200 holes which were surveyed previously with a Faro arm.
    3. The resistance of the wires will be measured after the surveying.
    4. We are planning to use Al standoffs in place of the brass ones because their resistance is similar and Al is so much lighter.
    5. Calibration with cosmics is undergoing discussion. We have been thinking about possibilities for calibration with scintillator paddles above and below the magnet.
    6. We are starting to work on the TDR.