Difference between revisions of "February 17, 2012 Fab Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Meeting Time and Place ==
 
== Meeting Time and Place ==
  
Friday Feb 17, 2012 at 2:30pm
+
Friday March 16, 2012 at 2:30pm
 
At Jefferson Lab, the meeting will be held in room ARC 231
 
At Jefferson Lab, the meeting will be held in room ARC 231
  
 
== Agenda ==
 
== Agenda ==
* ESH&Q minute - Fire watch and General JLab safety [[media:eye protection for welding.pdf]]
+
* ESH&Q minute - Smoke? Fire?
* Announcements -  [[Media:Tagger_noise.pdf]]
+
* Announcements -   
** Welding audit - April
+
** Promotions
 +
** Salary Adjustments
 +
** Charge codes
 +
** Open House May 19, Volunteers?
 
* FDC construction update -
 
* FDC construction update -
 
* PS magnet
 
* PS magnet
Line 13: Line 16:
 
* downstream carriage tracks
 
* downstream carriage tracks
 
* BCAL light guide gluing tests
 
* BCAL light guide gluing tests
* Assemble and test BCAL readout 1st article
+
* Assemble and test BCAL readout 1st article/Hall B test run
 
* Solenoid controls
 
* Solenoid controls
 
* Solenoid chimney
 
* Solenoid chimney
 
* LCW
 
* LCW
 
* Tagger thin window test
 
* Tagger thin window test
 +
* Cryo box nitrogen shield
 +
* overall schedule
  
 
== Open Action Items==
 
== Open Action Items==
  
 
== New Action Items==
 
== New Action Items==

Latest revision as of 09:41, 16 March 2012

Meeting Time and Place

Friday March 16, 2012 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - Smoke? Fire?
  • Announcements -
    • Promotions
    • Salary Adjustments
    • Charge codes
    • Open House May 19, Volunteers?
  • FDC construction update -
  • PS magnet
  • Collimator beamline
  • downstream carriage tracks
  • BCAL light guide gluing tests
  • Assemble and test BCAL readout 1st article/Hall B test run
  • Solenoid controls
  • Solenoid chimney
  • LCW
  • Tagger thin window test
  • Cryo box nitrogen shield
  • overall schedule

Open Action Items

New Action Items