February 1, 2012 Tracking CDC/FDC

From GlueXWiki
Revision as of 12:36, 1 February 2012 by Nsjarvis (Talk | contribs) (CDC Update)

Jump to: navigation, search

Meeting Time and Place

Wednesday February 1, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. FDC Update logbook
  3. CDC Update
    1. February 2012 GlueX-doc 1898

Tracking Software Agenda

  1. Announcements.
  2. Status of performance metrics.
  3. Summary of current work on tracking.

Hardware Minutes

Participants: Curtis, Naomi, Dave, Mark, Eugene, Tim, Simon, Beni, Lubomir

FDC Update

CDC Update

  1. Stringing - this should be finished next week, there were 220 wires left to do this morning.
  2. HV - 500V is being applied to (one end of) each wire and the (very small) current measured.
  3. Resistance - now is a good opportunity to measure the resistance of each wire.
  4. Survey - wires need to settle for a week before finishing tension measurements. Tim will schedule the survey team between Feb 20 and March 5.
  5. Remaining hardware - the cheeseplate is on its way to CMU. Slava is working on the other hardware.
  6. Soldering - Kait and Amy are now expert at this.

Collaboration meeting

One talk each will be scheduled for the CDC and FDC.

Software Minutes