Difference between revisions of "Feb 4, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
Line 43: Line 43:
 
=Minutes=
 
=Minutes=
  
Attendees:
+
Attendees: Elton, John, Yi, Pedro, Lubomir, Beni, Eugene (JLab); Christina (Athens); Serguei joined later (USM)
 +
 
 +
# Announcements
 +
#* None
 +
# Review of Action Items
 +
#* List to guide discussion and further work
 +
# Calibration/Monitoring
 +
#* Light sources in Bcal
 +
# FCAL
 +
#* Radiation Damage Studies
 +
#* Fabrication contract
 +
#* CR for rad hard glass
 +
#* PMT procurement
 +
# BCAL
 +
#* Construction Status
 +
#* Fibre tests
 +
# BCAL Readout
 +
#* Simulations
 +
#* SiPMs update
 +
#* Winston guides
 +
#* Geometry for guides, sensors, cooling and cables
 +
# Other business

Revision as of 15:29, 4 February 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
    • Geometry for inputing monitoring sources into Bcal
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
  3. Bcal
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Finalize shapes of "Winston guides"

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
    • Radiation Damage Studies
    • Fabrication contract
    • CR for rad hard glass
    • PMT procurement
  5. BCAL
    • Construction Status
    • Fibre tests
  6. BCAL Readout
    • Simulations
    • SiPMs update
    • Winston guides
    • Geometry for guides, sensors, cooling and cables
  7. Other business

Minutes

Attendees: Elton, John, Yi, Pedro, Lubomir, Beni, Eugene (JLab); Christina (Athens); Serguei joined later (USM)

  1. Announcements
    • None
  2. Review of Action Items
    • List to guide discussion and further work
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
    • Radiation Damage Studies
    • Fabrication contract
    • CR for rad hard glass
    • PMT procurement
  5. BCAL
    • Construction Status
    • Fibre tests
  6. BCAL Readout
    • Simulations
    • SiPMs update
    • Winston guides
    • Geometry for guides, sensors, cooling and cables
  7. Other business