Difference between revisions of "Feb 4, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
Line 15: Line 15:
 
# Bcal
 
# Bcal
 
#* Specify the normalization for the number of photons/GeV in showers
 
#* Specify the normalization for the number of photons/GeV in showers
 +
#* Decide on specific grouping for SiPM sums
 +
#* Finalize shapes of "Winston guides"
  
 
= Documents to Review=
 
= Documents to Review=
Line 35: Line 37:
 
#* Simulations
 
#* Simulations
 
#* SiPMs update
 
#* SiPMs update
 +
#* Winston guides
 
#* Geometry for guides, sensors, cooling and cables
 
#* Geometry for guides, sensors, cooling and cables
 
# Other business
 
# Other business

Revision as of 15:13, 3 February 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
    • Geometry for inputing monitoring sources into Bcal
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
  3. Bcal
    • Specify the normalization for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Finalize shapes of "Winston guides"

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
    • Radiation Damage Studies
    • Fabrication contract
    • CR for rad hard glass
    • PMT procurement
  5. BCAL
    • Construction Status
    • Fibre tests
  6. BCAL Readout
    • Simulations
    • SiPMs update
    • Winston guides
    • Geometry for guides, sensors, cooling and cables
  7. Other business

Minutes

Attendees: