Feb 14, 2013 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 17:04, 10 January 2013 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == == Tentative Agenda == # Announcements # Action Items # Schedule for production and testing (all) # mini-Bcal (Elton) # SiPM producti...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Action Items from previous meetings

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: