Difference between revisions of "FDC Readiness Agenda"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
9:00 am [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/FDC_Readiness_Review_Charge.doc Charge to the committee],               Eugene Chudakov
 
9:00 am [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/FDC_Readiness_Review_Charge.doc Charge to the committee],               Eugene Chudakov
  
9:10 am            ,              Lubomir Pentchev
+
9:10 am            [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Additional-Info/FDC_Review_Intro_March2011.pptx Overview and Physics Requirements],              Lubomir Pentchev
  
 
9:30 am            [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Additional-Info/FDC_DESIGN_OVERVIEW.pptx FDC Design],                            Bill Crahen                                                       
 
9:30 am            [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Additional-Info/FDC_DESIGN_OVERVIEW.pptx FDC Design],                            Bill Crahen                                                       

Revision as of 17:48, 30 March 2011

Hall D FDC Readiness Review Agenda

March 31, 2011 CC L102-104


9:00 am Charge to the committee, Eugene Chudakov

9:10 am Overview and Physics Requirements, Lubomir Pentchev

9:30 am FDC Design, Bill Crahen

9:50 am FDC Production, David Butler

10:20 am Recovery Procedures, Bill Crahen

10:40 am Chamber Testing Procedures, Lubomir Pentchev


11:00 am Break

1:30-2:30pm Visit of the FDC production facility (727 Blue Crab)

3:00 pm Discussions