Difference between revisions of "FDC Construction Details"

From GlueXWiki
Jump to: navigation, search
(Wire Plane Construction)
Line 14: Line 14:
 
These documents contain all steps involved to build the wire frame including the steps after stringing:
 
These documents contain all steps involved to build the wire frame including the steps after stringing:
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P012.pdf D000000103P012]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P012.pdf D000000103P012] FDC WIREPLANE PCB FITTING AND GLUING
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P013.pdf D000000103P013]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P013.pdf D000000103P013] FDC WIREPLANE PCB GAS BLOCK ATTACHMENT
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P015.pdf D000000103P015]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P015.pdf D000000103P015] FDC WIREPLANE LAMINATE THE G10/ROHACELL RING TO PCB
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P018.pdf D000000103P018]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P018.pdf D000000103P018] FDC WIREPLANE CLEAN FOR ENTRY INTO CLEANROOM
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P020.pdf D000000103P020]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P020.pdf D000000103P020] FDC WIREPLANE ATTACH TO STRONGBACK AND WIRING PREP
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P024.pdf D000000103P024]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P024.pdf D000000103P024] FDC WIREPLANE SCAN WIRE POSITIONS
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P025.pdf D000000103P025]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P025.pdf D000000103P025] FDC WIREPLANE APPLY EPOXY RING AND FIX WIRE
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P026.pdf D000000103P026]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P026.pdf D000000103P026] FDC WIREPLANE SOLDER WIRES
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P027.pdf D000000103P027]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P027.pdf D000000103P027] FDC WIREPLANE FREQUENCY TO TENSION MEASUREMENT
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P029.pdf D000000103P029]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D00000-01-03-P029.pdf D000000103P029] FDC WIREPLANE INSPECT AND INITIAL ELECTRICAL TEST OF BOARD
  
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P035.pdf D000000103P035]
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P035.pdf D000000103P035] FDC WIREPLANE LAMINATION INSPECTION
 
<!--
 
<!--
  

Revision as of 18:13, 30 March 2011

The GlueX FDC

Overview

Construction

Details of the FDC Construction

Global documents

Clean Room Procedures

Wire Plane Construction

These documents contain all steps involved to build the wire frame including the steps after stringing:

D000000103P012 FDC WIREPLANE PCB FITTING AND GLUING

D000000103P013 FDC WIREPLANE PCB GAS BLOCK ATTACHMENT

D000000103P015 FDC WIREPLANE LAMINATE THE G10/ROHACELL RING TO PCB

D000000103P018 FDC WIREPLANE CLEAN FOR ENTRY INTO CLEANROOM

D000000103P020 FDC WIREPLANE ATTACH TO STRONGBACK AND WIRING PREP

D000000103P024 FDC WIREPLANE SCAN WIRE POSITIONS

D000000103P025 FDC WIREPLANE APPLY EPOXY RING AND FIX WIRE

D000000103P026 FDC WIREPLANE SOLDER WIRES

D000000103P027 FDC WIREPLANE FREQUENCY TO TENSION MEASUREMENT

D000000103P029 FDC WIREPLANE INSPECT AND INITIAL ELECTRICAL TEST OF BOARD

D000000103P035 FDC WIREPLANE LAMINATION INSPECTION

Cathode/Ground Plane Construction

These documents contain all steps in the fabrication of the cathode foil and ground planes, gluing onto the cathode frame, and soldering rigid-flex assemblies:

D000000103P001

D000000103P002

D000000103P003

D000000103P004

D000000103P005

D000000103P006

D000000103P009

D000000103P037

D000000103P038

Stack Assembly

These documents contain all steps involved to assemble the FDC package (not yet ready).