Difference between revisions of "FDC Construction Details"

From GlueXWiki
Jump to: navigation, search
 
Line 18: Line 18:
 
These documents contain all steps involved in the wire stringing including tension measurements.
 
These documents contain all steps involved in the wire stringing including tension measurements.
  
===== Cathode Frame Construction =====
+
===== Cathode Foil Construction =====
These documents contain all steps involved in the cathode frame construction including critical steps like soldering the rigid flex foils and gluing the ground plane.
+
These documents contain all steps in the fabrication of the cathode foil to be glued onto the cathode frame.
  
===== Cathode Boards Construction =====
+
===== Cathode Plane Construction =====
These documents contain all steps in the fabrication of the cathode boards.
+
These documents contain all steps involved in the cathode plen construction including critical steps like soldering the rigid flex foils and gluing the ground plane.
  
 
===== Stack Assembly =====
 
===== Stack Assembly =====
 
These documents contain all steps involved to assemble the FDC package.
 
These documents contain all steps involved to assemble the FDC package.

Revision as of 16:46, 2 March 2011

The GlueX FDC

Overview

Construction

Details of the CDC Construction

Introduction
Global documents
Wire Frame Construction

These documents contain all steps involved to build the wire frame including the steps after stringing.

Wire Stringing

These documents contain all steps involved in the wire stringing including tension measurements.

Cathode Foil Construction

These documents contain all steps in the fabrication of the cathode foil to be glued onto the cathode frame.

Cathode Plane Construction

These documents contain all steps involved in the cathode plen construction including critical steps like soldering the rigid flex foils and gluing the ground plane.

Stack Assembly

These documents contain all steps involved to assemble the FDC package.