Difference between revisions of "December 17, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 23: | Line 23: | ||
#*** Plexiglass backup (Justin/Tim) | #*** Plexiglass backup (Justin/Tim) | ||
#* LED fiber feedthroughs and diffuser | #* LED fiber feedthroughs and diffuser | ||
− | #** Fiber mount location (Bill/Stephanie) | + | #** Fiber mount location (Bill/Stephanie) [https://halldweb.jlab.org/wiki/images/3/3c/Image005.png] |
#* Testing at JLab: | #* Testing at JLab: | ||
− | #** Laser alignment test in ESB (Bill) | + | #** Laser alignment test in ESB: lower box complete, upper box waiting for flange (Bill) |
#** Darkbox and airflow tests (All) | #** Darkbox and airflow tests (All) | ||
− | # | + | # Installation schedule (Tim) |
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: bar box internals, etc. (Yunjie) | #* Finalizing DIRC "as-built" geometry: bar box internals, etc. (Yunjie) |
Revision as of 13:31, 17 December 2018
Meeting Information
GlueX DIRC Meeting
Monday December 17, 2018
1:00 pm, EDT
JLab room F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box
- Fabrication status update (Ernie and Jason)
- Dark box enclosure: testing at Bates and delivered to JLab (Jason)
- Quartz window RTV at vendor and delivery schedule? (Ernie)
- Plexiglass backup (Justin/Tim)
- LED fiber feedthroughs and diffuser
- Fiber mount location (Bill/Stephanie) [2]
- Testing at JLab:
- Laser alignment test in ESB: lower box complete, upper box waiting for flange (Bill)
- Darkbox and airflow tests (All)
- Fabrication status update (Ernie and Jason)
- Installation schedule (Tim)
- Software/simulations
- Addressing ERR review recommendations
- Recommendations pertaining to DIRC commissioning should be addressed before installation.
- AOB