December 16, 2022 Tech group meeting
From GlueXWiki
Meeting Time and Place =
Friday December 16, 2022 9:30am TED 2559 and Teams
Agenda
- Safety -
- Mark's last meeting...
- New WC
- New Deputy WC position posted
- January Schedule 3rd-12th
- Get DIRC operational
- Install new .o18 orifice with radiator
- Fill optical boxes
- Modify Tagger Microscope
- Install New Profiler
- Remove and replace ComCal
- Install GEM
- BCAL/FDC chiller swap
- Air compressor relief test
- Goniometer run through axis
- Target mod for hydrogen
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication - complete
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- Cabling/patch panels
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Man lifts
- Electronic patch panels
- Liftable frame mods
- Cable trays
- drip pan
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks - S&A completed upper half
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete
- Epoxy fittings to tubes and leak check
- JBweld conductive epoxy tubes to blocks
- HDList updates - weekly!
- KLONG dwgs
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas
- Offsite gathering