Dec 2, 2008 BCAL Construction

From GlueXWiki
Revision as of 10:02, 1 December 2008 by Elton (Talk | contribs) (Teleconference Instructions)

Jump to: navigation, search

Teleconference Instructions

Persons onsite at JLab meet in CC F228

  • +1-800-377-8846 : US
  • +1-888-276-7715 : Canada
  • +1-302-709-8424 : International
  • then enter participant code: 39527048# (remember the "#")

Items for followup from Oct 15 meeting

Documents to Review

  1. Dan's questions: Media:BCAL_questions.doc

Tentative Agenda

  1. Announcements
  2. Base Plate
    1. Discuss hole/pocket locations, sizes and tolerances
    2. Are drawings final? If yes, expedite prototype base plate construction
    3. O-ring location
  3. Top Plate
    1. Have it thicker than 8mm and machine it down for leveling?
    2. Features machined after previous step (holes then are not through)
    3. How are the tracking packages mounted inside BCAL (Tim, brief description)
  4. Drawings
    1. Overall Tolerances, conflicts, stacking of systematic building errors
    2. Danny's/Kevin's questions
    3. Kevin's plans at Ross for 7.5o fixture
  5. Assignment of machining tasks (UofA, Ross Machine Shop)
  6. Other business
    1. Use DocDB (has version capability) for Drawings uploads; PDF for sure, maybe other formats (engineering, 3D renderings)?