Difference between revisions of "Dec 2, 2008 BCAL Construction"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 19: | Line 19: | ||
# Base Plate | # Base Plate | ||
## Discuss hole/pocket locations, sizes and tolerances | ## Discuss hole/pocket locations, sizes and tolerances | ||
− | ## Are drawings final? | + | ## Are drawings final? If yes, expedite prototype base plate construction |
## O-ring location | ## O-ring location | ||
# Top Plate | # Top Plate |
Revision as of 17:57, 26 November 2008
Contents
Teleconference Instructions
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Items for followup from Oct 15 meeting
- See Wiki page Oct 15, 2008 Calorimetry
- Construction Manager
- Progress at UofA on job description, job ad
- Co-Op job ads
Documents to Review
Tentative Agenda
- Announcements
- Base Plate
- Discuss hole/pocket locations, sizes and tolerances
- Are drawings final? If yes, expedite prototype base plate construction
- O-ring location
- Top Plate
- Have it thicker than 8mm and machine it down for leveling?
- Features machined after previous step (holes then are not through)
- How are the tracking packages mounted inside BCAL (Tim, brief description)
- Drawings
- Overall Tolerances, conflicts, stacking of systematic building errors
- Danny's/Kevin's questions
- Kevin's plans at Ross for 7.5 deg fixture
- Assignment of machining tasks (UofA, Ross Machine Shop)
- Other business
- Use DocDB (has version capability) for Drawings uploads; PDF maybe other formats?