Difference between revisions of "Dec 17, 2008 BCAL Construction"

From GlueXWiki
Jump to: navigation, search
(Action Item List)
(Action Item List)
Line 22: Line 22:
 
# <strike>Gilbert will submit a list of all tools required and cost estimates by middle of next week.</strike>
 
# <strike>Gilbert will submit a list of all tools required and cost estimates by middle of next week.</strike>
 
# Gilbert will send a drawing of the machining set up for jlab to reference.
 
# Gilbert will send a drawing of the machining set up for jlab to reference.
# Detailed schedule for preparation for module production (Gilbert)
+
# Detailed schedule for preparation for module production (Gilbert).
# Gilbert and Jan need 3d stp file for NC programming ( Tim to supply)
+
# Tim to supply 3d stp file for NC programming to Gilbert and Jan.
 
# ''In progress:'' George submitted a QA plan last month. Needs to be reviewed by Tim and Elke.
 
# ''In progress:'' George submitted a QA plan last month. Needs to be reviewed by Tim and Elke.
 
# Manpower
 
# Manpower

Revision as of 11:29, 16 December 2008

Teleconference Instructions

Meeting time 13:00-14:00 Newport News / 12:00-13:00 Regina / 11:00-12:00 Edmonton

  • +1-800-377-8846 : US
  • +1-888-276-7715 : Canada
  • +1-302-709-8424 : International
  • then enter participant code: 39527048# (remember the "#")

Quick Reference Links

Documents to Review

  1. Dan's corner block: Image

Action Item List

  1. Tim will supply updated drawings and post on DocDB by this friday
  2. Gilbert will submit a list of all tools required and cost estimates by middle of next week.
  3. Gilbert will send a drawing of the machining set up for jlab to reference.
  4. Detailed schedule for preparation for module production (Gilbert).
  5. Tim to supply 3d stp file for NC programming to Gilbert and Jan.
  6. In progress: George submitted a QA plan last month. Needs to be reviewed by Tim and Elke.
  7. Manpower
    • Construction Manager: Progress at UofA on job description, job ad
    • Co-Op job ads

Tentative Agenda

  1. Announcements: Pb-vendor responses (Tim)
  2. Corner block concept: indexing during machining at Ross (Dan)
  3. Go-nogo Gauge: discuss concept/implementation (Jan/Gilbert)
  4. Installation: how to lift matrix from Al base plate off steel beam
  5. Other business

Minutes

Attendees: Regina - Zisis, George, Andrei, Dan, Keith, Alberta - Gilbert, Jan, Richard, JLAB - Elke, Elton, Tim