Difference between revisions of "Dec 10, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 45: Line 45:
  
 
Attendees:
 
Attendees:
 +
 +
# Announcements
 +
#* Reminder: Next Thu Bcal Readout meeting internal status review of readout technology
 +
# Review of Action Items
 +
# Calibration/Monitoring
 +
# Fcal
 +
#* Fabrication contract (Elton and Matt)
 +
#* CR for rad hard glass
 +
#* PMT procurement
 +
#* FCAL [http://dustbunny.physics.indiana.edu/~jvbennet/simTalk.pdf prototype update] (Jake)
 +
# Bcal
 +
#* Construction Status
 +
#* Construction Prototype [[Image:ConstProto.jpg|50px]] vs. Module 01 [[Image:Mod01.jpg|50px]]
 +
# BCAL Readout
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1390 FM light guide geometry] Chuck Hutton
 +
#* [http://www.jlab.org/Hall-D/software/wiki/images/9/9e/Geant4CAD2.pdf GEANT4 CAD importer] Edward and Alam
 +
# Simulations
 +
# Other business

Revision as of 18:14, 14 December 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Fernando to provide information on how to turn on digitization on FADC.
    • Matt to supply Fernando with the latest Cockcroft-Walton schematics.
  2. Bcal
    • Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
  3. Bcal readout
    • JLab will investigate purchasing some prototypes from Plastic Craft.
    • USM will investigate options for producing prototypes in Chile.
    • Zisis to check on status of Baby Bcal shipment.

Documents to Review

Tentative Agenda

  1. Announcements
    • Reminder: Next Thu Bcal Readout meeting internal status review of readout technology
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
    • Fabrication contract (Elton and Matt)
    • CR for rad hard glass
    • PMT procurement
    • FCAL prototype update (Jake)
  5. Bcal
    • Construction Status
    • Construction Prototype ConstProto.jpg vs. Module 01 Mod01.jpg
  6. BCAL Readout
  7. Simulations
  8. Other business

Minutes

Attendees:

  1. Announcements
    • Reminder: Next Thu Bcal Readout meeting internal status review of readout technology
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
    • Fabrication contract (Elton and Matt)
    • CR for rad hard glass
    • PMT procurement
    • FCAL prototype update (Jake)
  5. Bcal
    • Construction Status
    • Construction Prototype ConstProto.jpg vs. Module 01 Mod01.jpg
  6. BCAL Readout
  7. Simulations
  8. Other business