Difference between revisions of "Dec. 13, 2007 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 6: Line 6:
  
 
== Agenda ==
 
== Agenda ==
 +
* Discussion of preamp/preamp board tests for the FDC and CDC.
 +
** configuring/powering the daughter and interposer boards
 +
** required measurements to give feedback to Mitch, Gerard, and Fernando
 +
** Visit to CMU
 +
 +
* Updated Design Report Documentation
 +
** On the Wiki pages
 +
** For the next version of the DR
 +
 +
* Cooling the preamp cards and specific requirements
 +
** FDC
 +
** CDC 
 +
 +
* Chamber installation issues.
 +
 +
* Chamber alignment issues.
 +
 +
* System monitoring and time histories.
 +
 +
* HV and LV systems.
 +
 +
* Readout, HV, and LV cabling issues.
 +
 +
* Gas system design.

Revision as of 17:24, 10 December 2007

Meeting Connections

To connect from the outside, please use ESNET at

1.) ESNET: 8242553

Agenda

  • Discussion of preamp/preamp board tests for the FDC and CDC.
    • configuring/powering the daughter and interposer boards
    • required measurements to give feedback to Mitch, Gerard, and Fernando
    • Visit to CMU
  • Updated Design Report Documentation
    • On the Wiki pages
    • For the next version of the DR
  • Cooling the preamp cards and specific requirements
    • FDC
    • CDC
  • Chamber installation issues.
  • Chamber alignment issues.
  • System monitoring and time histories.
  • HV and LV systems.
  • Readout, HV, and LV cabling issues.
  • Gas system design.