Preparations for the Hall D DC and PID Final Design and Safety Review <br> | Preparations for the Hall D DC and PID Final Design and Safety Review <br> | ||
+ | Review: Mar 27 and 28 <br> | ||
# [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Review Documents] (halld guest) | # [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Review Documents] (halld guest) |
Revision as of 10:08, 22 February 2008
Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28
- Review Documents (halld guest)
- Charge, Agenda, Reviewers,
- P3e Schedule (gluex)
- First round of dry runs (week of March 10) TENTATIVE
- Monday F326/327 Mar 10
- Talk 1 2:30pm Curtis
- Tuesday F326/327 Mar 11
- Talk 2 4:00 pm Yves
- Wednesday F326/327 Mar 12
- Talk 3 8:00 am Dan
- Talk 4 4:00 pm David
- Thursday F326/327 Mar 13
- Talk 5 4:30 pm Fernando
- Talk 6 4:30 pm Elton
- Friday L207 Mar 14
- Talk 7 8:00 am Eugene
- Talk 8 10:00 am Tim
- Monday F326/327 Mar 10
- Second round of dry runs (week of Mar 17) TENTATIVE
- Pre-brief Material. Due Mar 19 to reviewers.
- Documents
- Drawings
- Other?
- Final talks to Elke:Tue Mar 25
- Review: Mar 27 and 28
- issues that need special attention