Difference between revisions of "Controls Meeting 8-Mar-2012"

From GlueXWiki
Jump to: navigation, search
m
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
* Minutes from previous meeting [[Controls_Meeting_23-Feb-2012|23-Feb-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_23-Feb-2012|23-Feb-2012]]
* Counting house installation, power, UPS power, fibers, Tagger bldg, etc. - Hovanes, Mark, Elliott
+
* CDC thermocouples - Elliott
** [[Media:CH_rack_assignment-1.pdf|proposed rack layout]]
+
* Counting house installation - Hovanes
 
* Equipment orders - Mark, Hovanes
 
* Equipment orders - Mark, Hovanes
 
* [[Solenoid_Controls_Redesign]] - Mark, Josh, Scot, Yi, Elliott
 
* [[Solenoid_Controls_Redesign]] - Mark, Josh, Scot, Yi, Elliott
** SOE circuit, installation and programming
+
** coil tap circuits, SOE, QD, shunt replacement, ground fault detector, etc.
** QD, shunt replacement, ground fault detector, racks, UPS power to racks
+
** NI PXI device testing
+
* Experiment Control Supervisor - Elliott
+
 
* EPICS - Hovanes, Nerses
 
* EPICS - Hovanes, Nerses
 
** archiver, alarm system, scalers, etc.
 
** archiver, alarm system, scalers, etc.
Line 16: Line 13:
 
* Target, goniometer, other new systems - Hovanes, Elliott
 
* Target, goniometer, other new systems - Hovanes, Elliott
 
* PLC programming - Josh
 
* PLC programming - Josh
** talking to TCP via EWEB (or EN2T?)
 
** program redesign, new features, new computer
 
 
* Elogs and databases - Elliott
 
* Elogs and databases - Elliott
 +
** inventory database
 
** [https://halldweb1.jlab.org/elog-halld Midas elog]
 
** [https://halldweb1.jlab.org/elog-halld Midas elog]
 
** Operator elog
 
** Operator elog
** inventory database - CED, CLAS, IRMIS?
+
* Experiment Control Supervisor - Elliott
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
  
Line 45: Line 41:
 
=Minutes=
 
=Minutes=
  
Present: Elliott W, Mark S, Josh B.
+
Present:

Revision as of 14:14, 7 March 2012

Agenda

  • Announcements
  • Minutes from previous meeting 23-Feb-2012
  • CDC thermocouples - Elliott
  • Counting house installation - Hovanes
  • Equipment orders - Mark, Hovanes
  • Solenoid_Controls_Redesign - Mark, Josh, Scot, Yi, Elliott
    • coil tap circuits, SOE, QD, shunt replacement, ground fault detector, etc.
  • EPICS - Hovanes, Nerses
    • archiver, alarm system, scalers, etc.
  • Test stand - Hovanes, Josh
  • Target, goniometer, other new systems - Hovanes, Elliott
  • PLC programming - Josh
  • Elogs and databases - Elliott
  • Experiment Control Supervisor - Elliott
  • Mantis task tracker


Time/Location

10 AM Thurs 8-Mar-2012 CC L207


Announcements

Next Meeting

9:30am 22-Mar-2012 CC L207


Minutes

Present: