Difference between revisions of "Controls Meeting 7-Feb-2013"

From GlueXWiki
Jump to: navigation, search
m
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(11 intermediate revisions by one other user not shown)
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
** Permanent room change to A110
 
** Permanent room change to A110
 +
** Josh leaving in 3 weeks, Dave takes over, who will be backup?
 
* Minutes from previous meeting [[Controls_Meeting_24-Jan-2013|24-Jan-2013]]
 
* Minutes from previous meeting [[Controls_Meeting_24-Jan-2013|24-Jan-2013]]
 +
* Saga of the EPICS archiver - Hovanes, Elliott, Graham
 +
* Experience with Elog - Elliott, Hovanes, Graham
 
* Network outage in solenoid control system last week - Josh, Hovanes, Elliott
 
* Network outage in solenoid control system last week - Josh, Hovanes, Elliott
 
** how might we determine the PLC is operating properly and controlling all tags?
 
** how might we determine the PLC is operating properly and controlling all tags?
* Update on gas system hardware purchase - Josh, Dave
+
* Update on gas system - Dave, Josh
* Counting House computer purchase update - Hovanes, Elliott
+
* Counting House computer system - Hovanes, Elliott
** Hall D file server is central component
+
** file server is central component
** Windows applications - PC vs terminal server
+
** Windows applications - PC's vs terminal server
 +
** start using code management (SVN)
 +
** general (non-whitelisted) web access?
 +
** where to put computers in the hall?
 +
** A-B license servers?
 +
** new printer, Tom's printer, scanner
 
* UPS power in the hall - Elliott
 
* UPS power in the hall - Elliott
 
** [http://www.cor.com/Series/PowerLine/SK/ RFI power line filters]
 
** [http://www.cor.com/Series/PowerLine/SK/ RFI power line filters]
Line 15: Line 23:
 
* Solenoid test status - Josh, Mark, Scot, Elliott
 
* Solenoid test status - Josh, Mark, Scot, Elliott
 
** MySQL and logging
 
** MySQL and logging
** SOE installation, PXI UPS, Danfysik fan on UPS, QD, EWEB
+
** SOE, PXI and UPS, Danfysik fan and UPS, QD, EWEB
* Printers/scanners:  new, Tom's - Elliott
+
* Experience with new Elog - all
+
 
* Other controls applications
 
* Other controls applications
** Josh leaving in 3 weeks, Dave takes over, who will be backup?
+
** Use code management for PLC code once file server installed
** Code management for PLC code
+
 
** FCAL, BCAL, FDC cooling, etc.
 
** FCAL, BCAL, FDC cooling, etc.
* [http://halldweb1.jlab.org/JInventory JInventory] - Elliott
+
* [http://halldweb.jlab.org/JInventory JInventory] - Elliott
** barcode readers and labels, conventions, etc.
+
** barcode readers, label printers and pre-printed labels, conventions, etc.
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
+
* [http://halldweb.jlab.org/mantisbt Mantis task tracker]
* [https://halldweb1.jlab.org/elog-halld Midas elog]
+
* [https://halldweb.jlab.org/elog-halld Midas elog]
  
  
Line 37: Line 42:
  
 
9:30AM Thurs 7-Feb-2013 CC A110
 
9:30AM Thurs 7-Feb-2013 CC A110
 
  
  
  
 
==Announcements==
 
==Announcements==
 
  
  
Line 48: Line 51:
 
==Next Meeting==
 
==Next Meeting==
  
9:30am Thurs 21-Feb-2013
+
'''Skipping a meeting due to collaboration meeting'''
 +
 
 +
9:30am Thurs 7-Mar-2013
  
  
  
 
=Minutes=
 
=Minutes=
 +
 +
(written after the collaboration meeting based on faulty memory and inadequate notes!)
 +
 +
 +
Present:  Elliott W, Dave B, Graham H (forgot to record who else).
 +
 +
 +
 +
'''EPICS Archiver'''
 +
 +
Still negotiating with Accelerator, hoping to bring computer cost down from original $55k.
 +
 +
 +
 +
'''Elog'''
 +
 +
So far so good for solenoid test, but many requested features not implemented.  Basic entries w/attachments work, as does autolog entries, comments and updates.
 +
 +
 +
 +
'''Network Outage'''
 +
 +
Do NOT muck with network equipment, contact Elliott, Hovanes or David L prior to touching anything.  We lost connection to the PLC for a few hours due to a cabling mistake.
 +
 +
 +
 +
'''Gas System'''
 +
 +
Dave will order PLC equipment.  He will test PLC and some sensors in his test setup in the ARC.
 +
 +
 +
 +
'''Counting House'''
 +
 +
We are in the process of ordering/borrowing computer equipment and should have a basic system installed by the end of the month.  We will purchase remaining equipment in conjunction with the upcomong large CC order (may be able to save a lot).  Furniture and consoles are mostly chosen and we hope to order everything by early next month.
 +
 +
 +
 +
'''UPS Power in the Hall'''
 +
 +
Final decision by Giles, but it looks like using RFI line filters to filter power from the Counting House UPS and running circuits down to the hall is the way to go.  Fernando is happy with this.
 +
 +
 +
 +
'''Solenoid Test'''
 +
 +
Still waiting for Cryo to fix compressors, might go cold in a few weeks.  Danfysik power supply to be checked out, including new PLC code (by Dave).  SOE almost ready, needs to be checked.  QD needs modifications and testing.  PXI needs to be tested.  Some cables still to be installed.  MySQL logging by RSLogix program working well after database mods.

Latest revision as of 13:15, 31 March 2015

Agenda

  • Announcements
    • Permanent room change to A110
    • Josh leaving in 3 weeks, Dave takes over, who will be backup?
  • Minutes from previous meeting 24-Jan-2013
  • Saga of the EPICS archiver - Hovanes, Elliott, Graham
  • Experience with Elog - Elliott, Hovanes, Graham
  • Network outage in solenoid control system last week - Josh, Hovanes, Elliott
    • how might we determine the PLC is operating properly and controlling all tags?
  • Update on gas system - Dave, Josh
  • Counting House computer system - Hovanes, Elliott
    • file server is central component
    • Windows applications - PC's vs terminal server
    • start using code management (SVN)
    • general (non-whitelisted) web access?
    • where to put computers in the hall?
    • A-B license servers?
    • new printer, Tom's printer, scanner
  • UPS power in the hall - Elliott
  • EPICS update - Hovanes
  • Solenoid test status - Josh, Mark, Scot, Elliott
    • MySQL and logging
    • SOE, PXI and UPS, Danfysik fan and UPS, QD, EWEB
  • Other controls applications
    • Use code management for PLC code once file server installed
    • FCAL, BCAL, FDC cooling, etc.
  • JInventory - Elliott
    • barcode readers, label printers and pre-printed labels, conventions, etc.
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott


Time/Location

Note permanent room change!

9:30AM Thurs 7-Feb-2013 CC A110


Announcements

Next Meeting

Skipping a meeting due to collaboration meeting

9:30am Thurs 7-Mar-2013


Minutes

(written after the collaboration meeting based on faulty memory and inadequate notes!)


Present: Elliott W, Dave B, Graham H (forgot to record who else).


EPICS Archiver

Still negotiating with Accelerator, hoping to bring computer cost down from original $55k.


Elog

So far so good for solenoid test, but many requested features not implemented. Basic entries w/attachments work, as does autolog entries, comments and updates.


Network Outage

Do NOT muck with network equipment, contact Elliott, Hovanes or David L prior to touching anything. We lost connection to the PLC for a few hours due to a cabling mistake.


Gas System

Dave will order PLC equipment. He will test PLC and some sensors in his test setup in the ARC.


Counting House

We are in the process of ordering/borrowing computer equipment and should have a basic system installed by the end of the month. We will purchase remaining equipment in conjunction with the upcomong large CC order (may be able to save a lot). Furniture and consoles are mostly chosen and we hope to order everything by early next month.


UPS Power in the Hall

Final decision by Giles, but it looks like using RFI line filters to filter power from the Counting House UPS and running circuits down to the hall is the way to go. Fernando is happy with this.


Solenoid Test

Still waiting for Cryo to fix compressors, might go cold in a few weeks. Danfysik power supply to be checked out, including new PLC code (by Dave). SOE almost ready, needs to be checked. QD needs modifications and testing. PXI needs to be tested. Some cables still to be installed. MySQL logging by RSLogix program working well after database mods.