Difference between revisions of "Controls Meeting 6-Feb-2014"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 20: Line 20:
 
* Dave is pretty close to defining the UPS requirements for the PLC in Hall D.  
 
* Dave is pretty close to defining the UPS requirements for the PLC in Hall D.  
 
* Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements.
 
* Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements.
 +
 +
=== Scope of the meetings ===
 +
* Hovanes announced that the purpose of the slow control meetings is to coordinate the activities related to controls performed by people from multiple Hall D groups.
 +
* Before working on an assignment from the meeting everyone needs to check with his/her supervisor before starting to work on those tasks.
 +
 +
=== UPS requirements for Motor and Network switches in Hall D ===
 +
* According to Hovanes, the only motorized application in Hall D requiring functionality during power loss is the total absorption counter.
 +
* Based on the information from Dave Butler on the location of the PLC hardware, Hovanes defined which network switches will need to be on UPS. 
 +
 +
=== interlocks for BCAL and FDC ===
 +
* Dave presented his plans for the BCAL and FDC interlocks and showed the status of the work.

Revision as of 10:52, 10 February 2014

Agenda


Time/Location

9:30AM Thurs 6-Feb-2014 CC A110


Minutes

Items from previous meetings

  • Dave is pretty close to defining the UPS requirements for the PLC in Hall D.
  • Dave still needs to get some information about the safe positions of valve in solenoid to define the solenoid UPS requirements.

Scope of the meetings

  • Hovanes announced that the purpose of the slow control meetings is to coordinate the activities related to controls performed by people from multiple Hall D groups.
  • Before working on an assignment from the meeting everyone needs to check with his/her supervisor before starting to work on those tasks.

UPS requirements for Motor and Network switches in Hall D

  • According to Hovanes, the only motorized application in Hall D requiring functionality during power loss is the total absorption counter.
  • Based on the information from Dave Butler on the location of the PLC hardware, Hovanes defined which network switches will need to be on UPS.

interlocks for BCAL and FDC

  • Dave presented his plans for the BCAL and FDC interlocks and showed the status of the work.