Difference between revisions of "Controls Meeting 6-Feb-2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 5: | Line 5: | ||
* Scope of these meetings (All) | * Scope of these meetings (All) | ||
* UPS requirements for controls in Hall D (Dave, Yi, Hovanes) | * UPS requirements for controls in Hall D (Dave, Yi, Hovanes) | ||
+ | ** [[media:ups_4_motors_and_switches.pdf | UPS for Motors and Network Switches in Hall D]] | ||
* Status of interlocks for BCAL and FDC power supplies (Dave) | * Status of interlocks for BCAL and FDC power supplies (Dave) | ||
* GlueX collaboration meeting (Hovanes) | * GlueX collaboration meeting (Hovanes) |
Revision as of 22:36, 5 February 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 23-Jan-2014
- Scope of these meetings (All)
- UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
- Status of interlocks for BCAL and FDC power supplies (Dave)
- GlueX collaboration meeting (Hovanes)
Time/Location
9:30AM Thurs 6-Feb-2014 CC A110