Difference between revisions of "Controls Meeting 6-Feb-2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]]
 
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]]
* Scope of these meeting (All)  
+
* Scope of these meetings (All)  
 
* UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
 
* UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
* Status of interlocks for BCAL and FDC power supplies (Dave, Hovanes)
+
* Status of interlocks for BCAL and FDC power supplies (Dave)
 
* GlueX collaboration meeting (Hovanes)
 
* GlueX collaboration meeting (Hovanes)
 
   
 
   

Revision as of 15:56, 5 February 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 23-Jan-2014
  • Scope of these meetings (All)
  • UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
  • Status of interlocks for BCAL and FDC power supplies (Dave)
  • GlueX collaboration meeting (Hovanes)


Time/Location

9:30AM Thurs 6-Feb-2014 CC A110