Difference between revisions of "Controls Meeting 6-Feb-2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 4: Line 4:
 
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]]
 
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]]
 
* Scope of these meeting (Hovanes)  
 
* Scope of these meeting (Hovanes)  
* UPS requirements for Hall D (Dave, Yi, Hovanes)
+
* UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
 
* Interlocks for BCAL and FDC power supplies (Dave, Hovanes)
 
* Interlocks for BCAL and FDC power supplies (Dave, Hovanes)
 
   
 
   

Revision as of 20:57, 3 February 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 23-Jan-2014
  • Scope of these meeting (Hovanes)
  • UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
  • Interlocks for BCAL and FDC power supplies (Dave, Hovanes)


Time/Location

9:30AM Thurs 6-Feb-2014 CC A110