Difference between revisions of "Controls Meeting 6-Feb-2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 4: | Line 4: | ||
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | * Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | ||
* Scope of these meeting (Hovanes) | * Scope of these meeting (Hovanes) | ||
− | * UPS requirements for Hall D (Dave, Yi, Hovanes) | + | * UPS requirements for controls in Hall D (Dave, Yi, Hovanes) |
* Interlocks for BCAL and FDC power supplies (Dave, Hovanes) | * Interlocks for BCAL and FDC power supplies (Dave, Hovanes) | ||
Revision as of 20:57, 3 February 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 23-Jan-2014
- Scope of these meeting (Hovanes)
- UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
- Interlocks for BCAL and FDC power supplies (Dave, Hovanes)
Time/Location
9:30AM Thurs 6-Feb-2014 CC A110