Difference between revisions of "Controls Meeting 6-Feb-2014"
From GlueXWiki
(→Time/Location) |
(→Agenda) |
||
Line 3: | Line 3: | ||
* Announcements | * Announcements | ||
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | * Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | ||
− | * Scope of | + | * Scope of these meeting (Hovanes) |
* UPS requirements for Hall D (Dave, Yi, Hovanes) | * UPS requirements for Hall D (Dave, Yi, Hovanes) | ||
* Interlocks for BCAL and FDC power supplies (Dave, Hovanes) | * Interlocks for BCAL and FDC power supplies (Dave, Hovanes) |
Revision as of 17:48, 3 February 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 23-Jan-2014
- Scope of these meeting (Hovanes)
- UPS requirements for Hall D (Dave, Yi, Hovanes)
- Interlocks for BCAL and FDC power supplies (Dave, Hovanes)
Time/Location
9:30AM Thurs 6-Feb-2014 CC A110