Line 6: | Line 6: | ||
** CAEN HV crates (Almost Done) | ** CAEN HV crates (Almost Done) | ||
** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done) | ** PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done) | ||
+ | **: Issues with username/password? | ||
* New ComCal chiller controls | * New ComCal chiller controls | ||
* MyaViewer retirement (Hovanes) | * MyaViewer retirement (Hovanes) |
Revision as of 15:32, 29 May 2019
- Announcements
- Solenoid status (Tim,Beni)
- New alarms
- Remote resets (Hovanes, Nick)
- Three VME crates used by OPS for our controls (Done)
- CAEN HV crates (Almost Done)
- PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate (Done)
- Issues with username/password?
- New ComCal chiller controls
- MyaViewer retirement (Hovanes)
- Test setup for power crates (Nick)
- TOF upgrades
- DIRC installations
- Other business
- Possible upgrades to RHEL7 in August.
Time/Location
10:00AM Thursday 30-May-2019 CC B101