Difference between revisions of "Controls Meeting 3-May-2012"
From GlueXWiki
m |
m |
||
Line 11: | Line 11: | ||
** FMEA, UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc. | ** FMEA, UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc. | ||
* [http://halldweb1.jlab.org/JInventory JInventory database] - Elliott | * [http://halldweb1.jlab.org/JInventory JInventory database] - Elliott | ||
− | |||
− | |||
− | |||
− | |||
* Test stand - Hovanes, Josh | * Test stand - Hovanes, Josh | ||
− | * PLC programming - Josh | + | * PLC programming and PXI system - Josh |
* Elogs and databases - Elliott | * Elogs and databases - Elliott | ||
** [https://halldweb1.jlab.org/elog-halld Midas elog] | ** [https://halldweb1.jlab.org/elog-halld Midas elog] | ||
** Operator elog | ** Operator elog | ||
+ | * [http://halldweb1.jlab.org/mantisbt Mantis task tracker] | ||
* Experiment Control Supervisor - Elliott | * Experiment Control Supervisor - Elliott | ||
− | |||
− | |||
Line 28: | Line 23: | ||
==Time/Location== | ==Time/Location== | ||
− | 9:30 AM Thurs | + | 9:30 AM Thurs 4-May-2012 CC L207 |
Revision as of 17:19, 1 May 2012
Agenda
- Announcements
- summer students and new Mantis tasks
- Minutes from previous meeting 19-Apr-2012
- EPICS - Hovanes, Vanik
- alarm system, stepper motors, goniometer, UConn boards, other power supplies, etc.
- Counting house installation - Hovanes, Mark
- Solenoid_Controls_Redesign - Mark, Josh, Scot, Yi, Elliott
- FMEA, UPS power to Danfysik, coil taps and PXI, SOE, QD, shunt replacement, ground fault detector, etc.
- JInventory database - Elliott
- Test stand - Hovanes, Josh
- PLC programming and PXI system - Josh
- Elogs and databases - Elliott
- Midas elog
- Operator elog
- Mantis task tracker
- Experiment Control Supervisor - Elliott
Time/Location
9:30 AM Thurs 4-May-2012 CC L207
Announcements
Next Meeting
9:30am 3-May-2012 CC L207