Difference between revisions of "Controls Meeting 25-Mar-2021"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
 
* BCAL temperature PLC controls stability (Nick)  
 
* BCAL temperature PLC controls stability (Nick)  
 
* GUIs for BCAL chiller controls (Hovanes)
 
* GUIs for BCAL chiller controls (Hovanes)
 +
*: [[media:bcal_chillers_plc.jpg | Snapshot of EPICS GUIs]]
 
* Magnet power supply related temperature readouts (Scot)
 
* Magnet power supply related temperature readouts (Scot)
 
* FCAL HV controls modifications (Hovanes, Nick)  
 
* FCAL HV controls modifications (Hovanes, Nick)  

Latest revision as of 09:10, 25 March 2021

  • Announcements
  • Solenoid status
    State code in PLC (Nick)
    PXI issues (Brian)
  • BCAL temperature PLC controls stability (Nick)
  • GUIs for BCAL chiller controls (Hovanes)
    Snapshot of EPICS GUIs
  • Magnet power supply related temperature readouts (Scot)
  • FCAL HV controls modifications (Hovanes, Nick)
  • FCAL2 chillers (Nick)
  • Vacuum gatevalve problems and PLC-s (Nick)
  • DIRC N2 Issues
    North DIRC N2 flow (Scot)
    New DIRC N2 controls
  • Other items
    power on FCAL platform
    network switch in the tagger hall
    disconnected racks in the tagger hall

Time/Location

10:00am Thursday 25-Mar-2021