Difference between revisions of "Controls Meeting 25-Mar-2021"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
* FCAL2 chillers (Nick)
 
* FCAL2 chillers (Nick)
 
* Vacuum gatevalve problems and PLC-s (Nick)
 
* Vacuum gatevalve problems and PLC-s (Nick)
* DIRC N2 Issues- North  
+
* DIRC N2 Issues
 +
*: North DIRC flow (Scot)
 
*: New DIRC N2 controls   
 
*: New DIRC N2 controls   
 
* Other items
 
* Other items

Revision as of 15:33, 24 March 2021

  • Announcements
  • Solenoid status
    State code in PLC (Nick)
    PXI issues (Brian)
  • BCAL temperature PLC controls stability (Nick)
  • GUIs for BCAL chiller controls (Hovanes)
  • Magnet power supply related temperature readouts (Scot)
  • FCAL HV controls modifications (Hovanes, Nick)
  • FCAL2 chillers (Nick)
  • Vacuum gatevalve problems and PLC-s (Nick)
  • DIRC N2 Issues
    North DIRC flow (Scot)
    New DIRC N2 controls
  • Other items
    power on FCAL platform
    network switch in the tagger hall
    disconnected racks in the tagger hall

Time/Location

10:00am Thursday 25-Mar-2021