Difference between revisions of "Controls Meeting 25-Mar-2021"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
* FCAL HV controls modifications (Hovanes,Nick)  
 
* FCAL HV controls modifications (Hovanes,Nick)  
 
* FCAL2 chillers (Nick)
 
* FCAL2 chillers (Nick)
* Vacuum gatevalve problems (Nick)
+
* Vacuum gatevalve problems and PLC-s (Nick)
 
* DIRC N2 Issues- North  
 
* DIRC N2 Issues- North  
 
*: New DIRC N2 controls   
 
*: New DIRC N2 controls   

Revision as of 15:17, 24 March 2021

Announcements

  • Solenoid status
    State code in PLC (Nick)
    PXI issues (Brian)
  • GUIs for BCAL chiller controls(Hovanes)
  • Magnet power supply related temperature readouts
  • FCAL HV controls modifications (Hovanes,Nick)
  • FCAL2 chillers (Nick)
  • Vacuum gatevalve problems and PLC-s (Nick)
  • DIRC N2 Issues- North
    New DIRC N2 controls
  • Other items
    power on FCAL platform
    network switch in the tagger hall
    disconnected racks in the tagger hall

Time/Location

10:00am Thursday 25-Mar-2021