Difference between revisions of "Controls Meeting 25-Mar-2021"
From GlueXWiki
Line 12: | Line 12: | ||
* Other items | * Other items | ||
*: power on FCAL platform | *: power on FCAL platform | ||
+ | *: network switch in the tagger hall | ||
+ | *: disconnected racks in the tagger hall | ||
==Time/Location== | ==Time/Location== | ||
10:00am Thursday 25-Mar-2021 | 10:00am Thursday 25-Mar-2021 |
Revision as of 15:15, 24 March 2021
Announcements
- Solenoid status
- State code in PLC (Nick)
- PXI issues (Brian)
- GUIs for BCAL/COMCAL chiller controls(Hovanes)
- Magnet power supply related temperature readouts
- FCAL HV controls modifications (Hovanes,Nick)
- FCAL2 chillers (Nick)
- Vacuum gatevalve problems (Nick)
- DIRC N2 Issues- North
- New DIRC N2 controls
- Other items
- power on FCAL platform
- network switch in the tagger hall
- disconnected racks in the tagger hall
Time/Location
10:00am Thursday 25-Mar-2021